TIME
ROLE
SALARY
Month 3
Network Technician
$67,000
Day 4.
As you arrive, you see the change ticket on your screen.On the east side of the floor, the six desks are fully set up, each jack cabled directly to the network room. None of them have been connected to the switch yet.

Figure 1 – Your first change
Sarah hands you the paperwork: "Your change. You cable it, you configure it, you prove it. I review after."
In the corridor, Dave watches you carry a spool of cable: "They gave you a ladder now? We had chairs at the helpdesk."
Answer the question below
Who reviews your change once it is finished?
The six PCs were delivered yesterday and plugged in at the desks. You patch the six cables into the SW-3F-ACC1 switch and sit down at the console.

Figure 2 – HQ infrastructure
The change ticket gives the port behind each jack:
JACK
SWITCH PORT
VLAN
3F-E01Gi1/0/2510
3F-E02Gi1/0/2610
3F-E03Gi1/0/2710
3F-E04Gi1/0/2810
3F-E05Gi1/0/2910
3F-E06Gi1/0/3010
Table 1 – The six desks of floor 3 east
Lab Instructions
Bring
Gi1/0/25toGi1/0/30up, in VLAN 10, with portfastAdd a description on each port: 3F-E01 to 3F-E06
The six PCs are already at the desks. From one of them, ask an address and ping the gateway
10.20.10.1Save the configuration
Finish the lab, then type the flag below.
Answer the question below
Enter the Flag
Sarah reviews your change at the end of the day.
"Six ports, six names. Next time you do not need to call me."
The six desks are in use on Monday morning.
Tomorrow, floor 3 goes out of service, and you'll need to figure out why.
Answer the question below
Which VLAN did the six new east side ports join?